This is a building assignment that you will be completing over Week 1 through Week 9. This is a stepwise project proposal assignment in which you will complete one (1) section each week for your MSN Capstone Project Proposal. By the end of the Week 9, this form will have been filled in completely and your MSN Capstone Project Proposal will be completed. It is important that you keep up with the Weekly Assigned Section. Each section is graded separately on a weekly basis while the final completed form will be graded with an overall grade. Each week the student will receive feedback from the instructor and the student is expected to incorporate the instructor feedback to edit and improve the weekly sections. The Week 9 final Capstone Project Proposal with be based on students incorporating the instructor’s weekly feedback.
How to use this form.
Late Assignments: Students will receive a 10-point grade reduction for each day the assignment is submitted past the due date. After three (3) days past the due date, students will receive a zero (0) for that weekly section but must complete for the final Week 9 grading.